The scheme would release up to 75 million litres of treated recycled water into the Thames during dry spells.

Water would be piped from the Thames to reservoirs, with treated wastewater from Mogden Sewage Works topping up river levels.

Thames Water’s public consultation runs from today to August the 26th via its website.

Find the consultation here:
Teddington Direct River Abstraction – Statutory Consultation 2025