Several options are being proposed one of which is a ‘north west’ runway similar to the ‘original’ third runway which failed in 2010.
Another option is reviewing a north west runway first proposed in 2019 which would be at least 3,500 metres in length.
A third option which was proposed in 2009 under Labour is a shorter third runway of around 2,200 metres.



