The motorway will be closed between Junctions 10 and 11, in both directions, from Friday 15 March at 11pm until Monday 18 March at 5:45am
The closure is to allow for bridge demolition and gantry installation and is part of National Highways’ upgrade to the M25 at junction 10.
As part of the same scheme, the A3 is currently closed in both directions between Send and the M25 until 5.30am on tomorrow.